Wednesday, January 11, 2012

Surround.

Now that we've been visited by our insurance adjuster and given the blessing to cut and paste away in the bathroom, we sort of can't wait to get going. So in addition to Darrick ripping out about 90% of the tile (all except that under/around the toilet) and starting to piece apart the subflooring, we're addressing the tub/shower and surround.

The long and short of it is that it's all got to come out and it's all got to be replaced. We've been eyeing tubs and have plans to scope out a deal on one with the same width/length dimensions but a bit more depth. We're limited some by the placement of the drain and pipes, as the master bath shares a wall with the hall guestbath and we're not in the business of attempting any major changes in plumbing layout or structure. We're also limited some by being on the 2nd floor, as concerns over weight limits of the tub mean we can't invest in a a steel one that will last forever...not that we'd be likely to do that anyhow.

The other thing this means is that we're sort of stuck with the placement of all the major fixtures. The toilet in this bathroom shares the same major plumbing line, so we can't get a longer tub because not only would we need to move the wall of tub/shower plumbing, we'd have to relocate the toilet.

With all that said and done, we're eyeing ways to freshen things up and make the bathroom feel brand new without making those major changes. This is where the shower surround comes into play.

We briefly considered removing it, cleaning it, and re-attaching it to the walls after we get a new tub. In fairness, it's in really good shape considering it's possibly 20 years old (the house was constructed in 1992) and seems to be solid. But that's not enough for us. We've decided we want something a little more updated and custom, and our insurance adjuster has generously graced us with some funds to be able to make it happen.

Something like this:



From here.



From here.




































From here.


From here. (Just the walls, and just in the shower area. The idea of cleaning that floor makes me feel tired.)

From here. (I like the thick line of colored tile, but not sure if we'd do the whole bathroom like that, or just the shower/tub area.)

But before I get too carried away admiring beautiful and probably insanely expensive bathroom ideas, we had some practical work to be done in removing the shower surround. We'd cut away one side when the water damage first happened, but hadn't removed any. And I guess I was itching to remove something.

(The color on these is all kinds of wrong, but I didn't feel like making it better.)

The wall behind the first piece of fiberglass surround we removed. Darrick sliced the caulking and tonight while he was out I removed this piece.

Yeah, that's going to need to be fixed.

The back of the surround.

A close up of the fixed points.

Kids standing by it for scale. NO they weren't really that miserable. In fact, they are pretty into this whole thing.

Oh, yeah. This. We also took a sledgehammer to the bottom of the tub where the crack was to check out what condition the floor was in below it and allow maximum air circulation in case there was still moisture build-up down there. It looks like there was some level of tomfoolery happening here, with compressed particle board under the center of the tub, which otherwise would have sit a few inches above the floor. We're no experts, but we're pretty sure the half-assed job someone did here contributed to the tub cracking near the side, where there was no support to speak of.

Next up, we need to remove the back wall's surround, but I knew I wouldn't be able to do it myself. It's 5 feet long and the shorter end piece was probably between 50 and 60 pounds, so it's definitely going to be a 2-person job. We also borrowed a shop vac to suck up the dust from tile demo. This weekend has some serious work in store for us.

Tuesday, January 10, 2012

Success In All Measures.

I thought I'd start running and hate it. I thought I'd keep running and learn to deal with it, even if I still didn't like it. I thought I'd keep going a few more weeks and run a 5k and smile and feel proud. And I thought, somewhere in the middle of it, that I'd be melting away pounds like nobody's business.
Well, technically it IS nobody's business, but that has not happened. I did start running and hate it, then keep running and learn to deal with it. I kept going, and in just over 2 weeks I'll be running a 5k ON my birthday, which is all kinds of amazing and pride-inspiring. And yet, 8 weeks into this new goal of mine, I'm down half a pound. HALF a pound is not exactly melting away, you know?

Shit, at this rate it will only take me 508 more weeks to hit my goal weight.

So there you have it. And this morning when I stepped on the scale and saw that I'm barely floating half a pound below my start weight and I'm running 3 days a week, I went into self-sabotage mode in my mind. For breakfast I was good, but by lunchtime I was tempted to scrap my healthy low-point lunch and run out for something delicious and indulgent. I wanted cookies and chocolate bars. I contemplated wine with dinner and an ice cream cone after.

But I didn't do it. I stuck to my planned breakfast and lunch and opted for a salad with dressing on the side for dinner. I even skipped dessert and went for a run.

And I guess it paid off, because while I was logging my run tonight I discovered I HAVE made progress. I log my miles and minutes, so an easy math calculation can tell me how fast I'm running, and it has been pretty underwhelming so far. I mean, I knew I was slow, but I didn't know I was running around a 14 minute mile until I found the map my run site. But tonight I did something different: I ran on main roads. Usually I run in my neighborhood, up and down residential streets. I prefer it that way because I almost never see anyone while on my run, so I don't feel self-concious about my speed or how I look while running. Tonight, though, I did about 80% of my run on main streets around my neighborhood. It not only made me keep going a bit faster than usual, it also felt a little safer to me.

And the results are real: my running time was just over a 12 minute mile today. That means that while I've barely shed half a pound in 8 weeks, I have managed to increase my run time by about 2 minutes per mile in just over 2 weeks. At this rate, I might just finish that 5k in under 40 minutes!

And, yes, I promise I will be happy with that!

Saturday, January 7, 2012

Updates in January.

I just completed Week 7 of C25K, and it was really, really hard. All 3 runs were 25 minutes, and according to the podcast I use, that's supposed to equal a 2.5 mile run. Can I just take a minute here to point out how insane it is to think that I'm supposed to go from 'couch' to 10-minute miles in just over 6 weeks? I came home after each of this week's runs and mapped them, and I'm not quite clocking 2 miles in 25 minutes. I'd be embarassed to admit that it takes me more than 12 minutes to run a single mile except for the fact that I've never in my LIFE run for 25 minutes straight, so while I'm a little disappointed in my distance, I'm really trying to focus on the positives.

Week 8 will kick off for me tomorrow, upping the runs from 25 to 28 minutes. So far this year I ran 5.26 miles (and I added a ticker right up top on my blog, over there --->, to keep me accountable), and on top of it? I may not be seeing the numbers on the scale changing yet, but I am feeling a difference in my body. I definitely feel the burn in my legs while running, and can feel my muscles tightening up. The other night, after my first 25 minute run, I even made Darrick feel my calves to see how strong they are getting. Nerd.

----------------------------------------------------

In bathroom news, our insurance adjuster is going to come out this afternoon to inspect the damage and let us know whether any of it's covered under insurance. I'm not optimistic. Honestly, they've already tried twice to have us pay for someone to come out to set up fans in the garage and 'remove moisture and humidity from the walls'. Um, great...except we're talking about just enough water to bathe two little kids (half full tub?) that leaked on a day that was 80 degrees with almost NO humidity. I'm thinking it's not likely worth several hundred to several thousand to pay someone to do that.

In the meantime, while we waited for the insurance people to come out, we started chipping out tile. Darrick figured out a new way of removing it without the pieces breaking so small, which definitely helps minimize dust and other messes. As of the other night, when these pictures were taken, he'd only chipped up a small section of the floor. However, in preparation for the adjuster's visit today, he chipped out the whole area in front of the tub. Under it is a tile subflooring we also need to remove, then the tub will be ready to pull out of its place!















These pictures are crappy and the colors are funny, but you can see the work he did in here in them.

***Update*** I took a few pictures to show what he did in here last night.





































--------------------------------------------------------------

In other news, Rohan has discovered his Mastocytosis spot. The other day, I witnessed him telling Luca he had a 'big ouchie' and pointing to his arm. She took it in stride (we've prepped her for this, explaining it to her in kid-terms from very early on so it would be a normal thing when it came up), telling him it wasn't an ouchie, it was just a spot that turns pink and puffy if he eats kiwi. I laugh because she must have heard us tell people this many times, that kiwi is the only food we know of so far that he has bad reactions to, and she picked it up and fed it right back to him. I did ask him if it was hurting, and he said no, so I think he was reacting to it looking like an ouchie more than it feeling ouchie. His spot is always a bit red and is about the size of a quarter, so I knew it would be a matter of time before he caught sight of it and asked about it.

He has since pointed it out to me a few times, and I just say "Oh yep, that's your little spot. It's ok right now though, so let's just leave it alone." With Masto, if he messes with the spot itself it could possibly trigger a histamine reaction that would cause him some irritation, so we're opting to just encourage him to leave it alone to hopefully avoid that. He still remains largely unaffected by his Masto, rarely having reactions like some kids with Masto do have, so I'm optimistic we can just approach this in a way that normalizes and minimizes it for him.

Tuesday, January 3, 2012

Drip. Drip.

Drip.

That was the sound of water leaking through our garage ceiling and landing on my car hood, the washing machine, and the floor. The sound of our master bath tub cracking, a tub full of water draining down the pipes and also into the floor and through the ceiling below.

That's our garage floor. We cut a few holes through the drywall that makes up the garage ceiling to be sure no water was pooling up there and to let it ventilate so it would dry faster.

And then we followed the ceiling beam to the end and sliced some more openings into the drywall, because water travels the path of least resistance and there were drips coming out that spot as well. For their part, Luca and Rohan dumped out two plastic bins full of train table pieces all over the floor upstairs so they could bring us the buckets to 'catch the water'. Ah, young helpers.

Once we were sure the water wasn't pooling in the ceiling and all the drips had ended, we went upstairs to survey the damage. And there it was in all its fiberglass glory:

Darrick decided to do two things right away (well, after a brief freak out and a lot of profanity): remove the baseboard by the sides of the tub to check for moisture and pull back one side of the tub surround to let it ventilate more.


He used a utility blade to cut through the silicone cauling around the perimeter of the surround, then grabbed the sides and pulled back. It came unstuck pretty easily, but rather than removing it entirely we left it affixed to the back wall and propped open, to let air flow behind it.

Removing the baseboard was simple enough with a hammer used to pry it away from the wall. Once we had that removed, we could feel a little moisture around the bottom edge of the tub. At this time, it's hard to tell if the moisture there means that water has soaked the subfloor and is causing damage, or if it was just damp because the kids had finished their (splashy) bath in there less than an hour earlier.

The good/bad news is that we have to remove the tub and replace it, but to do so we have to remove the tile in the room. The bathroom has saltillo tile, just like the entire downstairs used to have, and we remember all too clearly how un-fun removing all that tile can be. The tile sits on top of the front lip of the tub's apron, so there's no choice but to remove, at a minimum, the tiles directly in front of the tub. And if you're removing that, you may as well remove all of it. Which also means taking out the toilet until new tile is put in. And while we're in there, we may as well remove the countertop and cabinets, since the counters are a bit short for us (they only come up to my pelvis) and what better time than now to either get new ones or refinish and put risers under the current ones?

Do you see where this is going? Because I do. Which gets back to why this is good/bad news. On one hand, I'm not excited to spend the time and money removing the tile and tub and putting in new tile and tub and possibly replacing the countertops. On the other hand, the opportunity to maybe put in a deeper tub and raise the height of the counters and freshen up the look in that bathroom is pretty exciting.

For now, it's looking like our steps will be:

- Call insurance and file claim
- Remove baseboards
- Remove toilet and cover hole
- Remove tile
- Remove tub surround (also involves removing showerhead and closing off that pipe)
- Pull out and discard tub (also involves removing and covering drain into floor)
- Have insurance assessor look at damage and determine if it's going to be covered by insurance
- Cut away water-damaged drywall in garage ceiling
- Put in new insulation and replace drywall.
- Potential repair/replacement of subflooring in bathroom
- Potential refinishing of cabinets
- Removal of current counters and cabinets
- Removal of hardware (towel rack, light plates, etc.)
- Repaint bathroom ceiling and walls
- Installation of new tub and surround
- Hook up plumbing to bath and shower
- Installation of new flooring
- Installation of toilet
- Installation of cabinets (either refinished old ones with risers or new ones)
- Installation of countertops (either current one or new)
- Installation of tub surround

That's quite a to-do list, and that's an optimistic one based on the hope that there is no extensive damage to the subfloor, drywall of the garage ceiling, etc. If there is, this could get a lot more complicated (and expensive!).

Monday, January 2, 2012

8.

Today marks our 8 year wedding anniversary. In 8 years, we've sold 1 home, moved 3 times, gotten pregnant twice and had two kids, started new jobs, traveled, camped, fought and made up, faced some hard times and been blessed immeasurably.

I would say I love my husband as much today as I did the day I married him, but that's not exactly true. I love him just the same, and more, as I did 8 years ago when we stood up in front of friends and family and promised our lives and our futures to each other.

Sunday, January 1, 2012

New Years Tradition: 2012.

The past two New Years Days, Rohan has woken me before the sun was up, and before Darrick and Luca were up as well, and we've ventured out in the apricot and rose morning to take a photo.




































January 1, 2010.


January 1, 2011.

This year, we all slept in until about 7, when I grabbed him in his jammies and ran him outside for our photo op. He's almost too big to hold on one hip while taking a picture, so I ended up in this one. I can't believe the difference in him year to year. And I'm more than a little sad to think that this time next year I probably won't be able to hold him on a hip for our first photo of the new year. And how many more years before he won't even humor my love for a good photo op anyhow?

But, for now? For 2012? We stood together in the middle of the same street and smiled our hearts away. I love this sweet moment we steal just for us. What a way to kick off a new year!




































January 1, 2012

LinkWithin

Blog Widget by LinkWithin